Diomede Enterprises Inc (907) 345-0043, 651-C East 100th Ave, Anchorage, AK 99515 |
|
|
|
|
|
Metallic Building Co. - Secondary Framing
|
|
|
| Description: |
A horizontal structural
member which supports roof covering and is in the shape
of a Zee. |
| Gauge: |
16,14,13,12 |
| Depth: |
6", 8", 10", & 12" |
| Finish: |
Red Oxide Primer & pre-galvanized |
| Fasteners: |
Bolts |
| Lengths: |
Up to 35' |
| Usage: |
Secondary member to support
roof panels. |
| Limitations: |
Designed to
meet specific load criteria. |
| |
|
| |
|
 |
|
| |
Pictured
above is a purlin to rafter with a flange brace. |
|
| |
| DIMENSION: |
Depth |
Gauges |
6" |
16,14,12 |
8" |
16,14,13,12 |
10" |
14,13,12 |
12" |
14,13,12 |
|
| FEATURE |
|
BENEFIT |
| 1 |
Purlin
1/2" variance in flange width & 50 degree
angled stiffener lip. |
|
1 |
Allows
easy placement of purlins and easy installation
and greater stability. |
| 2 |
Nominal purlin
spacing of 5'. |
|
2 |
Economical design. |
| 3 |
50+ combinations
of size, gauge, spacing and lap length. |
|
3 |
Optimum design. |
| 4 |
Continuous purlin
lap lengths of 7 1/2", 1' 2 3/4", 2'
5 3/4", 3' 8 3/4" . |
|
4 |
Economical pricing. |
| 5 |
Pre-painted,
factory baked red oxide finish. |
|
5 |
Smooth, attractive
appearance, improved adherence & durability.
Therefore, no paint sticking problems. |
| 6 |
Purlin clips
welded to frame. |
|
6 |
Rest point during
installation, quicker installation, reduces purlin
roll under heavy loading, & increases stiffness. |
| 7 |
Optional gray
or pre-galvanized finish. |
|
7 |
Meets specifications,
greater resistance to some corrosive atmospheres. |
| 8 |
Tabbed sag angles
are used with standing seam options/systems. |
|
8 |
Reduces purlin
roll, increases stiffness, ease of installation,
greater stability, and increased load capacity. |
| 9 |
Easy purlin identification. |
|
9 |
Ease of installation. |
| 10 |
Members of LGSI. |
|
10 |
Meets specifications. |
| 11 |
With a wider
width and higher gauge zee-purlin, we can go to
a longer bays up to 40'. |
|
11 |
Longer bay buildings,
can be furnished with the advantages of a cold-formed
zee-purlin. |
|
|
|
|
|
|
|